Knitting I have planned.
1st and foremost - complete John's jacket in time for his 40th birthday, 21st March.
Complete Honey Bee stole (not started).
Mamluke socks - for Kate's 40th (was November 2007!)
Complete Pi Are Squared shawl in Lost Flock Fibers yarn About 1/3 or 1/4 complete).
Estes vest in black Cleckheaton Merino Supreme
Baby Cables and Big Ones Too in Bio Natur
Gytha in Treliske organic merino with Bio Natur for colour-work
Little Birds with the Rowan Yorkshire Tweed 4ply
Mermaid kit, Hanne Falkenberg
Winter wonderland coat - cream Cleckheaton Merino Supreme to be dyed in pieces
Falling water stole for Clare
Through the Keyhole
Intoxicating with the Knitwitches silk dk
Dainty pinstripes with the 4ply soft I bought on sale with JoVE!
Vivian (with the Rowan Yorkshire Tweed Aran)
That's most of the things I have in my head/in my queue on Ravelry, etc etc. We'll see. I'm not saying I'll knit them all this year!
I shall also do some plainish socks, as they're good to have on the go when around and about.
Emily's the knitter, Clare's the spinner, and we both like cocktails!
Tuesday, 13 January 2009
Subscribe to:
Post Comments (Atom)
1 comment:
Overwhelming list. But you should finish Kate's socks (I'm vaguely curious as to which Kate, but whoever, she deserves socks.) They make John's jacket look like a pipe dream.
Have you seen Vest-uary? Maybe the Estes vest could be part of that if you like joining in such things. (I've linked to Sarah's page on my blog, but I think she has stuff on Rav, too)
Assuming that maybe you have lots of long plane trips in which to complete some of this.
Post a Comment